PROCESS
Five steps. Each one with a deliverable.
Every step closes with a deliverable. We don't move on without your sign-off.
Five steps, end to end.
- 01
Technical Review & DFM
Moldability, wall and rib thickness, and draft analysis of your STEP/IGES files.
What we need from you
- 3D model (STEP)
- drawing
- annual volume
- material preference
What you get
- DFM report
- preliminary quote
- proposed cavitation
- INPUT
- STEP/IGES, drawing, volume, material
- OUTPUT
- DFM report
- APPROVAL GATE
- Order + sign-off on DFM changes
- INDICATIVE TIMING
- 2–5 business days
- 02
Mold Design & Simulation
Gating, slides and cooling layout, validated with mold-flow analysis.
What we need from you
- Sign-off on DFM changes / revised model
What you get
- 3D mold design
- mold-flow report
- steel list
- INPUT
- Approved part model
- OUTPUT
- 3D mold design + flow report
- APPROVAL GATE
- Mold design approval
- INDICATIVE TIMING
- 1–3 weeks
- 03
Machining & Fitting
Precision machining of hardened tool steel, then bench fitting and spotting.
What we need from you
- Mold design approval (release to manufacture)
What you get
- Assembled mold
- machining inspection records
- INPUT
- Approved mold design
- OUTPUT
- Assembled mold
- APPROVAL GATE
- Internal quality control
- INDICATIVE TIMING
- 3–7 weeks
- 04
T1 Sampling
First-shot trials, inspection and dimensional approval.
What we need from you
- Sample evaluation and written approval
What you get
- T1 samples
- inspection report
- process sheet; T2 if needed
- INPUT
- Assembled mold, resin
- OUTPUT
- T1 samples + inspection report
- APPROVAL GATE
- Written sample approval (ISIR/PPAP, if required)
- INDICATIVE TIMING
- T1: 3–7 business days · T2: +1–2 weeks
- 05
Series Production & Shipping
Uninterrupted production on approved parameters, packing and dispatch.
What we need from you
- Call-off schedule
- packing and labelling requirements
What you get
- Production parts
- lot labels
- shipping documents
- INPUT
- Approved sample + order
- OUTPUT
- Shipment + lot record
- INDICATIVE TIMING
- First shipment 1–2 weeks after approval
Timings are indicative (assuming a single- or multi-cavity mold of medium complexity); every project gets its own schedule with the quote.
Most asked about the process
NEXT STEP
Your part is ready. We'll build the tool.
Upload your files and we'll respond with a preliminary review.